Polish furniture producer SITS has successfully solved the problems related to drastically shortening the time needed for packing the orders for customers and reducing the number of technical equipment failures.
The approach was to implement a powerful and reliable traceability system for all production and delivery stages. The technical requirements to respect were the capability to read small DataMatrix codes at medium speed, measurements at each production stage, and the ability to have the data easily available for automatic logging software.
Full automation of SITS’ warehouse and production operations was obtained by using Skorpio™ X5, Rhino™ II, and PowerScan™.
The results are amazing:
Read the Success Story to know more about another challenge won by Datalogic.
Datalogic Scheduled Maintenance, Dec 15th, 1.45 AM / 2.00 AM (CET)
Datalogic wants to make you aware that on Dec 15th, 1.45 AM / 2.00 AM (CET), there will be scheduled down time for approximately 15 minutes.
We will be using this time to add more capacity to our infrastructure and speed up our overall service.
During this maintenance window, our Corporate Website (datalogic.com), Partner Portal (Extranet) and all the related services will be inaccessible.
All system functionalities will resume immediately after the maintenance window.
We appreciate your patience and understanding.